Project Description

The City of DeSoto retained G&A to design the priority wastewater improvements identified for each drainage basin in the firm’s previous I&I study of that basin. To date, G&A has been awarded design contracts for wastewater improvements in the following basins; Spring Creek, Heath Creek, Basin I, and Bee Branch with Basin O.

The plans for each basin were prepared, bid and constructed in three separate phases. Phase 1 covered the rehabilitation of sanitary sewer manholes using various methods such as manhole lining, replacement of manhole ring and cover, and installation of inflow protectors. Phase 2 covered the rehabilitation of sanitary sewer lines using various rehabilitation methods such as pipe bursting, Cast-In-Place-Pipe (CIPP), and point repairs. Phase 3 covered the replacement of sanitary sewer lines using open cut construction.