Project Description

G&A was retained to perform engineering and surveying services for the relocation of an 8” petroleum pipeline in conjunction with the expansion of West Airfield Drive at DFW Airport. G&A’s scope of services including topographic and right-of-way surveying, identifying and resolving utility conflicts, engineering plans for open cut construction and direction drilling, as-built survey and detailed record drawings.