Project Description

G&A was retained to perform engineering and surveying services for 12 separate Explorer pipeline relocations totaling 6.6 miles of pipeline in conjunction with the North Tarrant Expressway project. G&A’s scope of services including topographic and right-of-way surveying, pipeline route analysis, easement document preparation, identifying and resolving utility conflicts, engineering plans for open cut construction and direction drilling, construction staking, as-built survey and detailed record drawings.