Project Description
The Town separated this trail improvement project into three phases and G&A design the paving and drainage portion as a subconsultant to Mesa Design Group.
G&A’s design for Phase 1 involved an 8-foot wide, 0.5-mile long trail that started at Arapaho Road, extended past Belt Line Road, and ended at a linear park south of Beltway Drive. The project cost of $228,836 also included various pedestrian safety improvements at the street intersections.
G&A’s design for Phases 2 and 3 involved reducing the width of a section of Beltway Drive to create a trail on one side. Improvements were also made to the barrier free ramps and the crosswalk markings at four intersections along Beltway Drive. A new midblock crossing and accessible route was created to connect Les Lacs Park with the Addison Athletic Center entrance. The project construction cost was $2,018,182.
Address: 4350-4355 Beltway Dr, Addison, TX 75001